case study

M/Y TEMPEST
2008-2015


PHASE I: 2008-2009

Full Refit of the Engine Room

New Main Engines
New Generators
New Hydraulic plant
New Main switchboard
New Monitoring System
New Water Maker, UV Sterilizer System
New HVAC, Ventilation and AC System, Refrigeration
New Grew/Black Water System
New Bilge Separator
New Fresh Water Circuit including Pressure Pumps and Boilers
Service of the Stabilizers System
Renew all Navigation & Communication System
Modification of the Sundeck
Modification of the Main Saloon
Modification of the Aft Maindeck.
Modification of the Mast
New Power Management / Power Converter
Repair of the Steering Gear


Phase II: 2009-2010

Interior refit Part I

New Transom Watertight Door
Refit of the Main Saloon
Refit of the Gallery
Modification of the Sundeck arrangement
Modification of the Anchor Plate
Renewing of the Foredeck Capping Rail


Phase III: 2010-2011

Interior Refit Part II

New Deck Crane
Replacement of the Bowthruster
Complete Refit of the Interior: Guest Cabins, Master and VIP cabins, Dayheads.
Refit of the domestic water system
New stainless steel tanks


PHASE IV: 2011-2012

Exterior refit

New Teak Decking
General Painting
Underwater hull treatment from bare wood
New Swim Platform
New Ladders
New Swim Ladder
New Stainless Handrail & Stanchions
Service of Stabilizers, Windlass and Winches
Renew Hydraulic Power Unit
New wooden rubbing strake
Refit of the aft deck furniture


PHASE V : 2012-2013

RINA - Hydraulic - New Mast

Fabrication of a New Sundeck Mast
RINA Hull Valves Survey
RINA Tail Shaft Survey
RINA Rudder Survey
Stabilizer Overhaul
Crew Accomodation Refit
New Hydraulic Power Pack
New Stainless Steel Exhaust


PHASE VI : 2013-2014

Hull Wooden Repair-Topside Painting-Stainless Steel -Piping

Hull Wooden Repair, Structural Repair, Topside Painting, Portholes replacement, Hull Treatment, SW Piping, Stainless Steel Work, various Wooden Works, Varnish, Valves, Stainless Steel Polishing.


PHASE VII : 2014-2015

Hull Treatment, Sundeck Crane, Varnish

Hull Treatment, Varnish Work (Transom, Interiors & Floors)
Sundeck Crane Foundation
Superstructure Paint Work
Teak Deck, Hull Exhaust Refit, Stabilizer


 